            On March 1, 2018, the First Department entered their decision in Karwowski v. 1407 Broadway Real Estate LLC. This decision gleans two important considerations for insurers and practitioners, in the Appellate Division’s: (i) holding that a lessor’s indemnity provision will be triggered by a claim by a lessee’s contractor; and (ii) finding of factual issues with the lower court’s exclusion of a contractor’s workshop from liability under 241(6).

Background:

            Defendant 1407 Broadway Real Estate LLC (“Broadway”) is the owner of the building wherein this claim arose. Broadway holds an operating lease for the entirety of the building, located in Midtown Manhattan, New York. Defendant Cayre Grp Ltd. (“Cayre”) leases the 41st and 42nd floors of Broadway’s building, and holds a lease extension with Broadway. Plaintiff is a former employee of XCEL Interior Contracting, Inc. (“XCEL”), a third-party defendant in the action. While employed by XCEL, Plaintiff injured his hand while cutting plywood on an unprotected table saw, located on the 16th floor of Broadway’s building. Plaintiff’s injury was in the furtherance of a project undertaken by Cayre, for which XCEL was hired as a contractor.

Indemnity Trigger:

            Pursuant to the lease extension with Broadway, Broadway was given direction and coordination over XCEL, who was one of the lease’s memorialized approved contractors (“[a]ll work done by the contractor [XCEL] must be coordinated with the Building Manager”). This lease extension also contained the following indemnity, recited in pertinent part: “Tenant shall indemnify, defend and save harmless Landlord… from and against (a) all claims of whatever nature against Landlord arising from any act, omission or negligence of Tenant, its subtenant, contractors, licensees, agents, servants, invitees, employees or visitors…”

            Broadway cross-claimed below for summary judgment as to the issue of their contractual indemnification, a claim that was not granted. The First Department reversed and found for Broadway on this issue. The Appellate Division found that this indemnity was clear and unambiguous. In response, Cayre argued that this provision required a finding of “active negligence” or fault on behalf of Cayre. The First Department disagreed with this assertion, in holding that “all that is necessary to trigger the provision is a claim arising from any act or omission of Cayre or Cayre’s contractor…” (emphasis added). Cayre’s contractor here was XCEL, employer of the Plaintiff at the time of the alleged accident. The court held that no negligence was needed to trigger the indemnity, and instead, all that was needed was work being done by Cayre or their contractors within the building leased by Broadway.


Factual issue found in Labor Law §241(6) analysis:

           At the Supreme Court below, Plaintiff’s claims under Labor Law §241(6) were dismissed. Section 241(6) imposes on property owners (and lessee’s under Article 10 of New York Labor Law) the duty to provide reasonable protection and safety for workers, and to comply with all Department of Labor regulations. The issue in application of §241(6) was, primarily, centered around the physical location at which the injury took place. The location was the 16th floor of the building in question. A portion of the 16th floor was XCEL’s in practice, an area where they would keep materials and tools used for renovations within the building. However, no personnel or office furniture existed in a permanent capacity, and XCEL had no lease and did not pay any rent for the space. XCEL maintains a separate permanent office and workshop in Queens.

          In support of their motion for summary judgment as to the applicability of Labor Law §241(6), Defendant Cayre asserted that the 16th floor is a permanent workshop where “for the past 10 years, the… plaintiff reported to work each day….” Their argument concludes that due to these facts the 16th floor is not the statutorily protected “area[] in which construction, excavation or demolition work is being performed….” N.Y. Labor Law §241(6).

            In granting Cayre’s motion for summary judgment below, the Supreme Court found that the 16th floor of the building “was a permanent workshop controlled by XCEL, not a temporary staging area ancillary to the Project and controlled by Cayre.” By extension, this also released Broadway under §241(6).

            The First Department reversed and remanded for the court below, finding that “there are disputed issues of fact concerning whether the 16th floor space qualifies as a construction area.” In remanding, the Appellate Division cited such cases as Gerrish v. 56 Leonard, 147 A.D.3 511 (1st Dept. 2017) (factors for determining applicability of 241(6) are physical proximity, common ownership, and operation of off-site premises) and Gonnerman v. Huddleston, 78 A.D.3d 993 (2d Dept. 2010) (241(6) extends to areas where materials are being readied for use, contrary to areas where materials are merely stored for future use).

            Lastly, and most important for Labor Law practitioners, the First Department then reasoned that because §241(6) would apply if the saw had been utilized on the 41st floor, the Plaintiff should not have an “automatic loss of the protections afforded by the statute” because Plaintiff chose instead to cut the wood on the 16th floor, and then bring it up to the 41st floor in an elevator.

            Application of this trigger to indemnity warrants widespread consideration across the legal universe. The analysis of Labor Law §241(6) by the First Department should be applied by insurance carriers and Labor Law practitioners to all future cases concerning the Section. Insurers should be aware that the designation of a physical area as a construction area is increasingly subject to more liberal interpretations – especially in regards to defense-side summary judgments motions.
 Comments

Categories

 241(6)
 acquisitions
 adjusters
 ADR
 Alexander D. Fisher
 Alex Fisher
 Alissa Mendys
 alternative dispute resolution
 Anne Armstrong
 arbitration
 Arthur Xanthos
 attorneys
 attorneys fees
 audit
 automatic orders
 autonomous vehicle
 BCL 624
 board of directors
 bodily injury
 Bronx
 Brown v. Blennerhasset
 buildings
 business law
 business litigation
 carriers
 causation
 charity
 choice of law
 Christine Messina
 claims professionals
 closely held corporation
 co-op and condo
 co-ops and condo
 condominiums
 construction defect
 construction law
 contract drafting
 contract law
 contracts
 cooling tower
 Cornell v. 360 W. 51st Realty
 corporate mismanagement
 corporate records
 corporate veil
 corporations
 Court of Appeals
 crane collapse
 damages
 discovery
 dismissal
 divorce
 drafting
 due diligence
 equitable distribution
 Estates
 excessive
 expert preclusion
 Flintlock
 Fraser
 Frye
 Gartner + Bloom
 general contractors
 general partnerships
 GP
 Hudson Pointe Condominium Association
 HVAC
 indemnification
 indemnity
 indemnity provision
 inspection
 insurance
 insurers
 Jacqueline A. Muttick
 Jeff Miragliotta
 Jeffrey Johnson
 Joseph Rapice
 jury award
 Ken Bloom
 labor law
 ladder
 landlord
 lawsuit
 lawyers
 lease
 legal fees
 legionella
 legionnaires disease
 liability
 life insurance
 limited liability companies
 limited liability company
 limited liability partnerships
 limited partnerships
 litigation
 LLP
 LP
 Malouf v. Equinox Holdings
 Marc Shortino
 Medieval Festival
 Michael E. Kar
 Michael Kar
 mold
 mold litigation
 Motion Practice
 negligence
 New Jersey
 New Jersey Supreme Court
 noise complaints
 O'Brien v. Port Authority
 operating agreement
 partnerships
 personal injury
 preclusion
 premises liability
 proprietary lease
 punitive damages
 real estate
 risk management
 risk management meetings
 Roy Anderson
 sanctions
 Savel
 secondhand smoke
 Sessa v. Sessa
 shareholders
 shareholders agreement
 slip and fall
 spoliation
 statute of limitations
 statute of repose
 Stuart Gartner
 summary judgment
 SuperLawyers
 Susan Mahon
 tax partnership representative
 tenant
 tenants
 Theodoli
 The Palisades at Fort Lee Conndominium
 toxic tort
 Trusts
 Vera Tsai
 warranty of habitability
 Washington Heights
 water tower
 WHIDC
 Wills
 winter wishes

Archives

New York
801 Second Avenue,
11th Floor
New York, NY 10017
Phone: (212) 759-5800

New Jersey
110 South Jefferson Road,
Suite 300
Whippany, NJ 07981
Phone: (973) 921-0300

Follow Us